My optimum Bradley set-up is a " permanent" cold smoke set up consisting of an OBS SG, hooked to a cold smoke box, connected to a 6 rack, run by a PID and housed in a wooden "house". I'm getting there. (I'll apologize for the lousy pics ahead of time)
I have the OBS SG and homemade cold smoke box. I bought a damaged 6 rack cabinet. Wasn't too bad, just a dented rear left corner.
(http://i1047.photobucket.com/albums/b476/gusrobin/IMG_0885_zpse6c1323e.jpg)
Added a 2nd element
(http://i1047.photobucket.com/albums/b476/gusrobin/IMG_0879_zpsfd600fd4.jpg)
Installed 2 OBS in-line overtemp sensors and fuses.
(http://i1047.photobucket.com/albums/b476/gusrobin/IMG_0880_zps94a20060.jpg)
Added a used fan kit that I bought from a member a while back.
(http://i1047.photobucket.com/albums/b476/gusrobin/IMG_0882_zpsb5e003bc.jpg)
(http://i1047.photobucket.com/albums/b476/gusrobin/IMG_0883_zpsf84f99af.jpg)
You may notice on the previous photo that I have two plugs in the back. Each element will have its own plug in for power. The piece of sheet metal is a "patch" on where I initially installed the second plug. But there wasn't much room there and the metal power contacts were touching metal so when I first plugged them in I blew the breaker for the kitchen lights. So had to move it.
Last part of the mod was to add the additional 6 rack holders to make it a 12 rack. (Geez- I gotta smoke something in this soon or I am going to go blind with that shiny interior)
(http://i1047.photobucket.com/albums/b476/gusrobin/IMG_0884_zpscc240a12.jpg)
Two steps left - (1) I need to finish the control box, and (2) have to remodel the Bradley house - it was built for a 4 rack so I need to raise the top about 9 inches. Probably would have had the house done first but it has been raining all week.
More to come later.
Dang that thing is shiny ain't it!! You been busy Gus
ooohhh shiny, need to finish that project and break the unit in
Im blind,,,,,,,,,Im blind!! 8) ;D
That sure is purdy Gus