In series is what I did when I added the second 500 watter.
Get some high temp wire, some ring terminals and you're halfway there. Toughest part was cutting a notch on both sides of the ceramic insulators for wire clearance. If you have everything laid on when you start, it's about an hour job or less, depending on how fast you can cut those notches